Loading...
Loading...
Available on 1 platform
Sign in to view source links and access this dataset
Aggregating findings from a study examining the requirements to achieve a net-zero U.S. power grid by 2035. The analysis is based on different technology cost and performance assumptions, as detailed in an NREL technical report.
The dataset appears to be a summary or findings from a study, not necessarily raw simulation or observational data. The future 'last updated' date (2026-02-23) should be verified. Access to the complete NREL technical report may be required for full context.