Lincs Wind Farm: Wave Radar Measurements from Offshore Substation, 2021-2025
1files
Available on 1 platform
Sign in to view source links and access this dataset
Description
Wave height, period, and directional measurements from a wave radar installed at the offshore substation of the Lincs Wind Farm. The dataset covers December 2021 to April 2025, with a period from December 2021 to May 19, 2022 containing only wave height data due to a sensor malfunction. The data is provided by the Government Digital Service via the eu_open_data platform.
Use Cases
Modeling wave energy potential for renewable energy planning based on wave height and period data
Analyzing directional wave patterns for offshore structure design and maintenance
Investigating sensor reliability and data recovery in marine environments based on the described head malfunction period
Strengths
Provides a multi-year time series covering December 2021 to April 2025
Contains three key oceanographic variables: wave height, period, and direction
The description transparently notes a known data quality issue for a specific period
Limitations
Column-level documentation is absent; field semantics must be inferred after download
Row count is unknown, which may limit suitability assessment
Data for the period from December 2021 to May 19, 2022 is limited to wave height only
Provenance
Source
Government Digital Service
Collection Method
Measurements from a wave radar installed on an offshore wind farm substation.
Time Range
December 2021 to April 2025
Freshness
Last update date is unknown; freshness unverified
Geography
Lincs Wind Farm, North Sea (inferred from description)
License information is unknown; users should verify terms before use.