Loading...
Loading...
Available on 1 platform
Sign in to view source links and access this dataset
U.S. interconnection queue data used to study the impact of data center buildout on regional electricity demand. The replication package for Lamb (2026) includes analysis-ready panels, Python and Stata scripts, and final outputs. The main empirical result is a 34.8 index-point gap in ERCOT minimum hourly demand against a synthetic counterfactual.
Raw data must be acquired separately; the package contains derived data and scripts.