Loading...
Loading...
Available on 1 platform
Sign in to view source links and access this dataset
Bopaki Phogole's dataset contains survey and analysis data from approximately 1400 residents across South Africa, collected to study pathways linking greenspace usage to resilience against COVID-19 infection and severity. The data was used to fit structural equation models and includes variables on demographics, perceptions, and health outcomes. It was last updated on 2026-04-26 and is shared under a CC-BY-4.0 license.
Files are in R and XLSX formats; users may need compatible software. The dataset is very small (97.4 KB), indicating limited scope.