Loading...
Loading...
Available on 1 platform
Sign in to view source links and access this dataset
A proposal outlines plans for deep riser drilling up to 2500 meters below the seafloor on the Lord Howe Rise continental ribbon. The project, led by Geoscience Australia and JAMSTEC, aims to recover Cretaceous and older sediments to study tectonic and climatic history. Preparatory seismic surveys were conducted in 2016, with drilling planned for 2019 or 2020.
Data appears to be a project proposal and related survey reports, not a dataset of direct measurements or samples. Primary format is HTML documentation.