Loading...
Loading...
Available on 1 platform
Sign in to view source links and access this dataset
Selected key performance indicators on the TFL Road Network track serious and severe traffic disruptions and journey time reliability. The dataset includes the total number of road works, which was capped at 3,250 for any one period from 2013/14 to 2014/15, a 13.4% reduction from the previous cap. It was published by the Greater London Authority but has been discontinued.
License is unknown; terms of use should be verified before application.