Loading...
Loading...
Available on 1 platform
Sign in to view source links and access this dataset
A 525-metre long bridge was constructed over the Clarence River in Grafton, Australia, opening to traffic in December 2019. The report from the NSW Government details predictive noise modeling conducted during the project's pre-construction phase. It assesses the expected road traffic noise levels from the new bridge crossing.
Data is provided as a PDF report under the OGL-CA-2.0 license.