Loading...
Loading...
Available on 1 platform
Sign in to view source links and access this dataset
Jianping Sun's dataset from 2026 contains algorithm parameters and simulation results for a railway emergency resource scheduling model. The data, stored in an XLS file of 5.5 KB, supports a study that integrates fuzzy credibility constraints with interval programming to minimize scheduling time and cost. The results compare the performance of the VEPSO algorithm against PSO, NSGA-II, VEGA, and MOEA/D.
Data is provided in XLS format, requiring compatible software. Licensed under CC-BY-4.0.