Rickard Road Upgrade Community Consultation Report for South West Growth Area
Updated 26d ago
1filesPDF
Available on 1 platform
Sign in to view source links and access this dataset
Description
24 community submissions were received during the consultation period from 8 June to 3 July 2020 for the proposed upgrade of Rickard Road in New South Wales. The report, published by the NSW Government, details feedback on road design, environmental impacts, property impacts, and project timing. It includes the recommended route option identified in 2013 by DPIE and Camden Council.
Use Cases
Analyze community sentiment on infrastructure projects based on the 24 submissions received.
Study the integration of active transport features based on the described inclusion of pedestrian and cyclist pathways.
Review the impact assessment process for road upgrades based on the key issues of environmental and property impacts.
Strengths
24 community submissions provide a specific count of feedback received.
The consultation period is precisely defined as 8 June to 3 July 2020.
The report is associated with a specific strategic corridor identified in 2013.
Limitations
Column-level documentation is absent; field semantics must be inferred after download.
Row count is unknown, which may limit suitability assessment.
The data is provided as a PDF, which may require extraction for structured analysis.
Provenance
Source
NSW Government
Collection Method
Community consultation submissions and analysis by Transport for NSW.
Time Range
Consultation held June-July 2020; report references planning corridor from 2013.
Freshness
Last updated 2026-06-25 19:44:25.043849; freshness should be verified.
Geography
Rickard Road between Bringelly Road, Leppington and Oran Park Drive, Catherine Field, New South Wales, Australia.