Loading...
Loading...
Available on 1 platform
Sign in to view source links and access this dataset
Southern Grampians Shire Council provides a current land suitability model for Early Pome Fruit cultivation within its jurisdiction. The model was developed by Deakin University as part of a Land Use Capability project, with scientific methods detailed in a linked report. The dataset is available in multiple formats including CSV, JSON, and SHP, and was last updated on 2026-04-23.
License is CC-BY-2.5, which may have specific attribution requirements.