Loading...
Loading...
Available on 1 platform
Sign in to view source links and access this dataset
Data on the Tube upgrade programme between 2003/04 and 2010/11 was requested by the London Assembly to inform its 'State of the Underground' report. The dataset likely contains annual progress metrics like track and station refurbishment amounts, future milestones, and planned line capacity improvements. It was published by the Greater London Authority and related performance data is also available on the Datastore.
The description notes the original data is in Excel format and an open format conversion was planned; availability should be checked.