Yukon Mineral Exploration and Development Expenditures for 2020
Updated 1mo ago
3filesHTML
Available on 1 platform
Sign in to view source links and access this dataset
Description
70 to 80 million dollars in exploration expenditures were projected for Yukon in 2020, down from $117M in 2019. Development expenditures were expected to be $65M, a significant drop from $225M in 2019 due to the completion of construction at Victoria Gold Corp.'s Eagle Gold mine. The Yukon Geological Survey compiled this overview of the hard rock mining sector, tracking spending through press releases, SEDAR, and company correspondence.
Use Cases
Analyze the impact of COVID-19 on mining operations based on descriptions of adjusted procedures
Track regional mineral sector spending trends based on reported expenditure figures
Compare development and exploration investment levels based on the year-end projections
Strengths
Provides specific expenditure projections ($70-80M exploration, $65M development)
Includes comparative figures from the previous year (2019)
Identifies key operational adjustments made by companies during the pandemic
Limitations
Column-level documentation is absent; field semantics must be inferred after download
Row count is unknown, which may limit suitability assessment
Data may reflect temporal bias inherent to a single-year report
Provenance
Source
Yukon Geological Survey (YGS)
Collection Method
Tracks mineral sector spending through press releases, SEDAR and correspondence with companies.
Time Range
2020
Freshness
Last updated 2026-04-17 15:55:15.999845; freshness should be verified
Geography
Yukon, Canada
Data is available in HTML and PDF formats, not a structured data file.